a hundred meters bridge
a hundred meters bridge
Delivery date
2017
Contracting authority
CG de la Martinique
Architect
Soberco
Budget
8 500 000 € HT
Competition date
2013
Technical studies
IOA ingénieurs
Lighting design
les éclaireurs
Following the tropical storm that caused a devastating torrent of mud in 2010, reconstruction of the bridge that connects the two sides of the town of ‘‘Preacher’’. A tensed bow creates a discrete sign in the tropical landscape, at the bottom of the volcano “montagne Pelée”. With simple LED projectors hidden in the bow of the bridge, and two poles on each side, we light the road. The bow itself is illuminated in subtle colors.
a tensed bow in Le Prêcheur