footbridges above railway
footbridges above railway
Delivery date
2010
Contracting authority
sncf lyon
Project manager
les éclaireurs
Project size
600m²
Competition date
2010
Architect
soberco
Budget
130 000 € HT
Lighting design for two railway footbridges as part of the application of accessibility standards, on the regional express line from Lyons to Bourg en Bresse, France.14m high curved poles with LED spots provide a lighting level of 150lx on the stairways and 20lx on the platforms. The poles can fold down for an easier maintenance. The poles are set between the existing stairways and can be viewed from the footbridges.
railway footbridges and ‘fold-down’ poles