recreational spa
recreational spa
Delivery date
2009
Contracting authority
ville de balaruc-les-bains
Project manager
les éclaireurs - lucas goy
Project size
ext. 1400 m²
Competition date
2007
Architect
tectoniques architectes
Budget
4 800 000 € HT
Project size
int. 4 000 m²
ACE first prize lighting design award 2010
The lighting project sets off and highlights various key elements of the site : water, tropical vegetation and the building’s wooden architecture (inside and outside). The project is structured around the “rain path” glass wall, wich is lit up by bluish and white shades - a multimedia facade acting as a backdrop to the beach ensemble. Lighting effects throughout the building are centrally controlled by lighting scenarios using DMX. They interact with water fountains and guide visitors through a series of pool facilities.
O’balia recreational spa